---
title: "Karmiel Train Station"
description: "Railway linking Akko and Karmiel involves a double track along 23 kilometres and is part of  Netivei , the National Transport Infrastructure railways system. The project costs near 800 million dollars..."
url: https://lda-audiotech.com/de/portfolio_page/karmiel-train-station/
date: 2017-10-11
modified: 2019-10-14
author: "LDA Marketing"
image: https://lda-audiotech.com/wp-content/uploads/2017/10/karmiel_train_station_lda_01.jpg
type: portfolio_page
lang: de
---

# Karmiel Train Station

Railway linking Akko and Karmiel involves a double track along 23 kilometres and is part of [Netivei](https://www.iroads.co.il/en/), the National Transport Infrastructure railways system.

The project costs near 800 million dollars and includes a station in Ahihud and 4.6 kilometre Gillon Tunnels. The line links up the Haifa-Nahariya line, south of Akko station and north of Kiryat Motzkin station. Two more stations are planned along the new line at the Arab towns of Jadeidi-Makr and Majd al-Krum.

Karmiel Station has a LDA [NEO 8060 unit](https://lda-audiotech.com/de/neo-en-54-vas/) plus a [NEO Extension 4250E](https://lda-audiotech.com/de/productos-lda/neo-4250e/) mounted on a 22U rack with a battery charger. The system is accompanied by a [VAP-1 voice alarm panel](https://lda-audiotech.com/de/productos-lda/vap-1-notfallsprechstelle-nach-en-54-16/) with an expansion keyboard [VAP-8K](https://lda-audiotech.com/de/productos-lda/vap-8k-zonenerweiterung/).
